Toyota
Asprova APS schedules the production for Autoneum CZ, a leader in acoustic and thermal insulation for passenger and freight vehicles.
Integrated with their SAP, Asprova orchestrates parallel production scheduling, accounting for all capacities and constraints. At the group’s plant in Choceň, 65,000 items for vehicular insulation are manufactured every single day, so synchronization is vital.
Scheduling with Asprova since 2020, Autoneum has master-data of higher quality, improved their planning efficiency and production reporting, eliminated scheduling at the shop floor level, and reduced materials and WIP stocks by 25 %.