What Changed for Gebhardt Intralogistics
With Asprova, Gebhardt fundamentally changed how it plans and schedules production. What had been a largely manual, Excel-based process became automated, synchronized, and grounded in the realities of production. The real shift was not simply digitizing individual planning and scheduling steps, but creating a model that reflects the full complexity of production. Material availability, capacity, production sequences, assembly processes, employee qualifications, and both internal and external process steps now come together in a single schedule.
Asprova knows when materials will actually be available and when individual operations can start at the earliest. It flags missing materials, synchronizes semi-finished goods with downstream processes, and links subcomponents to assembly orders. This ties in-house manufactured parts to the customer orders they are needed for from the outset. So even if a part is initially treated as stock in the ERP system, Asprova already knows which customer order it belongs to.
External production steps such as galvanizing and painting are also part of the schedule. Asprova calculates pickup and return dates and lets Gebhardt test scenarios in which overloaded internal resources are relieved by outsourcing selected orders. When sequencing operations such as bending and turning, Asprova uses stored setup-time matrices to minimize changeovers and factor suitable alternative machines into the schedule.
In assembly, Asprova also supports Gebhardt with assembly groups and skills-based scheduling. Individual assembly orders can be grouped into efficient batches, while complex units are assigned to employees with the required qualifications. Schedule changes can also be assessed more reliably. Gebhardt can test whether a requested change is feasible and what impact it would have on other projects.
Production planning and scheduling at Gebhardt is now faster, more transparent, and more reliable. Processes are synchronized, inventory is lower, and project lead times are shorter.
Asprova updates more than 30,000 production orders every day across a 24-month planning horizon in around two minutes. More realistic sequencing has significantly accelerated project flow, with output now around three times higher than before Asprova.